Logo
Construction Accessories
crh_plc_company

Farrans Construction
Customer Care

The Farrans design team chose to use Fosroc waterproofing products, supplied by Beckett Construction Solutions, for the basement at the new Altnagelvin Hospital project in Londonderry. It provided them with the most cost effective and technically sound solution to ensure that the structural integrity of the building was retained. Technical support was provided on site to ensure that the product was installed correctly prior to concrete being placed. Beckett’s also ensured that the material was readily available in order to meet the requirements of the extremely demanding programme. All in all Becketts can provide the best solution when it comes to structural waterproofing”.

 

 
back to top



John McReynolds, John McReynolds (Contracts Manager, Morgan Est Farrans JV, Belfast Sewers)
Customer Care
"During the construction of the shaft walls, we used 40mm rebar couplers and bars from Beckett Construction Solutions as they allowed us to maximize concrete pours and reduce the number of construction joints. As a result we were able to maintain our extremely demanding programme. The bars were supplied to site pre-bent and ready to install and the design of the coupler itself ensured complete continuity across the construction joint”.
 
back to top



Mickey O'Rourke, Castle Street Belfast Site, J turley Ltd
Customer Care
We chose Thermal Bridging elements from Becketts because they provided a cost effective solution to a problem which can arise when installing balconies. The product eliminates the therma bridging that occurs at the interface of cantilevered structural elements such as our balconies. Becketts delivered to site in keeping with a demanding programme and provided an excellent back up serice. Isotec has proven to be an excellent choice in this development
 
back to top



Pat Owen, Pattons Soloist Site
Customer Care
We chose Plakatube Column Formers from Becketts for a number of reasons. The Simplicity of the products allowed us to pour a high level of columns in one pour instead of the usual long wait with the traditional Column Shutters which is labour intensive. Becketts also delivered the Columns to site at the height we required and on the dates requested. Becketts provided us with a very cost effective solution to keep the development on schedule.
 
back to top
Latest News
14 November 2008
Beckett/Fosroc provide Waterproofing Solutions to Basement at Altnagelvin Hospital

11 September 2008
New Product Guide available for download

3 October 2007
Beckett Appoint New Area Sales Managers as Part of their Ongoing Development

Read all news

Choose Beckett - We Have A Solution For Your Site



Click here
to download our current brochure.

site map | E-business by ITS new media